I was browsing through the many old projects. FFS was a huge one, given that I knitted for less than 3 years and was adventurous enough to take this on.
Wednesday, November 16, 2011
FFS redux?
Knitted by
Unknown
at
5:03 PM
1 Loops
Loop @ Frost Flowers and Leaves
Monday, October 23, 2006
Another Shawl Time
When was the last time an FO was documented here? Though there's not much FO updates, my needles have been kept busy. Anyway, here is the long awaited Aegean Flowers & Leaves.



Pattern: Frost Flowers & Leaves from A Gathering of Lace
Yarn: 8 oz of Jaggerspun Zephyr in Aegean Blue
Needle: 2.5mm circulars from Aero and Addi Turbos
Size: NA
Time to finish: 4 months ++
I could have finished it in less than 4 months, it was all due to distractions and the wait for needles to arrived. Never in Singapore can I find a 120cm size 2.5mm needle, somehow I managed to find 1 set online. All thanks to the internet.
The pictures don't do justice to the real thing at all. I took the picture half an hour ago before the sky opens up. There goes the natural light. I have another shawl up for post very soon.
Monday, August 28, 2006
Frost Flowers & Leaves Update #5
I think the photos will tell a better story. 



After 4 months of working on this project. I finally have this shawl blocked. Its actually dried and off the block. I shall have it modelled soon.
Knitted by
Unknown
at
6:51 PM
10
Loops
Loop @ Frost Flowers and Leaves
Sunday, August 20, 2006
Frost Flowers & Leaves Update #4
On the home stretch here. Two weekends and I'm half done with the edging. So it isn't as tedious. And that means half the stitches had came off the needles. Here's a picture of one corner. 
I started with 12 oz which is made up of a 8 oz hank and two 2 oz yarn cakes. I think I'm gonna left with 4 oz worth of Jaggerspun Zephyr in Aegean Blue. Most probably gonna destash it. any takers?
And thanks for the concern about my outburst in the earlier post. It must be the lack of knitting that caused it.
By the way, I finally got a new phone after 2 two years. The picture above was taken by this new gadget. I need to get a 2 gigabytes MiniSD card so that I can have those PDF patterns stored on the phone.
Knitted by
Unknown
at
2:39 PM
6
Loops
Loop @ Frost Flowers and Leaves
Sunday, August 06, 2006
Close, so close
I'm less than 20296 stitches (according to the excel sheet) away from finishing Chart 3 of FFL. No pictures to show, as its still a blue blob like last week's pic. The only difference is its mass and had occupied a larger area on my lap.
The weekend had been hot and dry. I was hoping for some rain to cool things down. The fan was on for as long as I was home. It seems like the dry season is here permanently.
I am so eager to finish FFL and have it block up. Before that, I need loads of junk food. Off to cook myself some instant ramen.
I just read the FFL KAL, and seems like the edging is going to be very boring. Hence, its gonna take more time than I expect. T_T
MORE RAMEN PLEASE!!!
Knitted by
Unknown
at
10:04 PM
3
Loops
Loop @ Frost Flowers and Leaves, WIPs
Sunday, July 30, 2006
Frost Flowers & Leaves Update #3
It's been more than 3 months since I started on FFL. In between there were distractions and I can't help but felt the lace pattern was monotonous. Good thing about monotonous is that I don't have to refer to the chart for every single stitch. The pattern is systematic but I still managed to live with a few mistakes. I just hope that once the shawl goes through blocking, everything will smooth their way out. Now the stamina to finish this off and I might even add another repeat is getting stronger.
Here's the pile of FFL, over my mole hill of clutter at, 46% away from completion.
and Dear Sarah,
The needle will defintely come handy for knitting 2 socks at once. Thus the chance of developing Second SOck Syndrome is minimized. I will be keeping the copy of mag you sent me and probably donate the extra one to the library or something.
On another note, I think it's time get a new phone, with all the functions packed in a candy bar. I might have more pictures in the future as this gadget packs a 3.2 megapixel cammie with Carl Zeiss optics. I have seen the pics taken by it and definately justifiable for the price. I can only be happier if I can get it at a fraction of the retail price. 
Knitted by
Unknown
at
10:16 PM
2
Loops
Loop @ Frost Flowers and Leaves
Sunday, July 23, 2006
More books
I think I should ban myself from the internet and from going out to the bookstore. These are the damages so far. 
Anyway, the past 48 hours were spent sleeping, eating, caught a movie with SO, knitting and finished 6 dvds of Goong. I was so tired after 2 dvds of Goong that I was sleeping through half of this show. I guess only guys like the SO would prefer this genre.
On the knitting front, Petunia is almost 50% done. Mom is urging me to have this knitted for her. I'm still considering cause its really a beautiful piece. About 98% of the knit stitches are done through the back loop. I will try to get a close up of the stitches if possible.
I also got buttons for the Knit1 Summer cropped cardigan. I got 5 x 1 inch diameter buttons instead of the recommended 3 x 1.5 inch size. I ill continue this if I got stuck with Petunia's pattern.
Oopz, did I mention that Vogue Knitting Fall preview is up? An issue worth getting as I'm only attracted to the socks.
Knitted by
Unknown
at
7:59 PM
3
Loops
Loop @ Frost Flowers and Leaves, Pattern Books Mags, Yarn P0rn
Monday, May 01, 2006
Frost Flowers & Leaves Update #2
This is the third weekend I spent with FFL. From the previous 248 stitches, I now have 552 stitches on the 60cm needle. All in all i have done a total of 20040 stitches and this is just the tip of the iceburg. I even timed myself for every repeat which was about 5 minutes, with 4 repeats, per round will need 20 minutes. I gonna do some maths here
Let's say its gonna take about 25 minutes for 550 stitches.
110 sts = 5 mins
And if i were to do 6 more repeats of CHart 2:
Total no of sts left , 134768 - 20040 = 114728 (!?!?!?)
I need another 5215 mins = 86 hours = approximately 4 days of continous knitting. But i don't have that luxury of knitting 24/7. If each weekend i can only spare 16 hours of knitting, I will need another 6 weekends to finish knitting and probably another weekend to block it.
Here's proof of 15% done.
Chart 1 + 1 repeat of Chart 2 = 82 rows
and why the bad picture? cuz my hands can't keep still after hours of knitting. I need a good massage~
Knitted by
Unknown
at
6:18 PM
3
Loops
Loop @ Frost Flowers and Leaves
Sunday, April 23, 2006
Frost Flowers & Leaves Update #1
After 2 weekends, frogging the cast on twice, trying to know which method is better, here's my FFL on Chart 1 Row 45.
As you can noticed, I'm using 2 circulars to knit this circular shawl. The metal dpns were too cumberson with the initial 8 cast on stitches. With the help of Eunny's tutorial, i cast on 8 stitches and placed them 4 on each circular. I did not place markers till i was on Row 5.
After taking this picture, I think I can start transfering the stitches onto the 60 cm circular.
As such, I got to cast on for the second sleeve of 1952.
Knitted by
Unknown
at
1:40 PM
2
Loops
Loop @ Frost Flowers and Leaves