Its a little more than 2 weeks before my wedding. And I kinda lost the mojo to knit, with so much happening around me. Hope to get back to the needles very soon.
I do have a couple pictures on my block activities.
And for the first time, my brother actually commented on my knitting. Its a compliment actually after being asked how that the shawl was constructed (inwards or outwards).
Due to the hairy-ness, this took a little longer than usual to dry. Afterwhich, the weather started to get wonky and there wasn't much sun, so blocking came to a hiatus. 
Hope to be back with FO pictures. Take care!
Wednesday, September 10, 2008
Lack of mojo
Monday, August 11, 2008
They are starring back
Yes, they are. And at me. I have knitted them and left them aside to start others. I've just laid out the Minimalist Cardigan on my bed. It just need to be seamed. (Charmaine, where are you!!??) Next are the stole/shawl to be blocked.
Queen Anne's Lace
Reversible Ribbed Stole 
One more to the list is the Cobweb Lace Shawl, which I had grafted both ends together this morning. I need more room in the house to block them out one by one.
Knitted by
Unknown
at
6:42 PM
3
Loops
Loop @ Shawl/Stole, WIPs
Tuesday, April 22, 2008
Of scarves and J-blogs
I have been ploughing hard in my field of knits. However the Knitting Fairy is not around for luck and I'm low on it. I cast on and frogged several potential WIPs. So I guess I better relax, take a step backwards for easy projects. This meant that I'm back to knitting scarves. I enjoyed every bit of it since I need not worry about shaping and gauge problems. I managed to pare down 8 skeins of yarn. 3 for Multidirectional Scarf and 5 for Midwest Moonlight.
I almost lost track in my blog hoppping among the tons of knitters/craftsters on Ravelry. Maybe I should start doing it by countries. First on the list is Japan. Seems like people around me had been or would be traveling there. Only God knows when I can go. Best thing about the internet? It brings everything up close.
Sen, her gorgeous tatting.
Ishi, formidable knits from Japanese books.
Chibitora, her 13 year old maltese is such a cutey
Hiiragi, she always look so good in her knits.
yasuwo, she's also knitting the Printed Silk Cardigan
Not to mention that the Japanese knitters have this blog dedicated to Phildar. (something like a KAL)
I may have more to show before the Sakura season ends. And I hope to show my scarves FOs by then. Wish me luck.
Saturday, March 22, 2008
Printed Bamboo
With the discussion of what yarn to use for Printed Silk Cardigan, I almost forgot about this yarn I bought over ebay. It came at the right time (after waiting for more than 8 weeks). Off I went to knit a swatch, it came up to be slightly big. I went down a needle size and thought it would do.
So here's what you see. I knitted the fronts and back in one piece and they are waiting for the sleeves and neck bands.
Close up on the embossed diamonds.
And I just arrived on Sleevey Island.
Tuesday, February 19, 2008
For the longest time
I shall take a little break from the hiatus and do a little update.
New Year was here and gone and so was the Chinese Lunar New Year. And I hope everyone had a good time during Valentines Day. DH gave me a few surprises which almost swept me off my feet. Well I will continue this story another day.
Back to knitting updates.
Even with the new gadgets like Wii and PSP, my needles were always occupied. I actually finished quite a few projects. Including the two below. (No FO pics at the moment though.
Myrtle leaf shawl with willow border
Venezia (more pictures here)
Now I need to get back to Wii Boxing and Trellis (from knitty.com)
Tuesday, November 27, 2007
Colorwork - Venezia

So I have:
- gotten the kit
- the needles
- courage?
- pattern
And here goes my first attempt at colorwork knitting. I guessed I was knitting on a tight tension, such that the hem puckered. So after completing like half the chart, I had to rip and start everything from the hem. Anyway, this is pretty common for colorwork beginners. They tend to tug a little more when changing colors. So beginners out there, so remember DO NOT pull when u change colors.
As of today, I have completed more than 2 repeats of the chart. Most probably I will be doing a V-neck modification via Maud's. More pics I hope, soon.
Saturday, October 27, 2007
Minimalist update
I started Minimalist after finishing half of Clementine, which I found its making me doze off. I thought that the seed stitch would have a similar effect, however the lovely texture make it all worthwhile. I had finish all the pieces and they are waiting to attend the seaming party. But then again, weekends were not saved to the ROM preps. I guessed Minimalist will have to wait a little longer for the party.


Friday, October 26, 2007
M-R-S in about two weeks
Oh gosh, time really flies by fast. With most of the things out of the way, I'm still having a little crisis. I haven't found the right shoes(I've cut down my expectation from "perfect"). The hand bouquet which my makeup artist offered wasn't what I was looking for, and I aint got a BIG buidget for the commercial ones. And I have not start making my own accessories, though I bought the crystals and materials last week.
Now I wonder if SO has been doing his bit.
ROM Checklist
- Date OK
- JP OK
- Venue OK
- Photographer OK
- Make Up & Hair OK
- Efile OK
- Rings OK
- Dress OK
- Ring Pillow OK
- Shoes
- Flowers
- Invitation Card N/A
- His’s Shirt ???
- His’s Pants ???
- His’s Shoes ???
- His’s Belt ???
- His’s Tie ???
- His’s Cufflinks ???
- Guestlist ???
A glimpse of my WIP Sarcelle. Amidst the preparation, I managed to squeeze time for knitting. Currently its on the decreasing section, so I guess it should be ready before the ROM. If so, Sarcelle will come in good use.
Sunday, September 09, 2007
WIP Sunday night
Alright, I finally managed to connect my mobile to my computer. Quite a few pictures have been taken but these came out the best. Amd remember to take a look at this post, I updated it with a WIP photo. Blaze was long finished, like in August?
Standby for some WIPs pics, all of them were already "transformed" into FOs.
Tweed Beret which lacks a little block.
Both Lace Dream and Hanami which survived from the blade.
I guess I have plenty of blocking ahead of me. Also I've started on the Mimialist Cardigan and, Clementine Shawlette is waiting to have the other half cast on.
Knitted by
Unknown
at
8:44 PM
3
Loops
Loop @ Finished Objects 2007, WIPs
Friday, September 07, 2007
Sunday, July 01, 2007
Forest Path Stole Update #2
The run has been slowed down to a stroll. However, I still managed to get 1 tier done a day. Its almost 2 weeks and I'm on to Tier 15 whilst doing this update. So I'm left with 8 more tiers which is so near. With what I have now, it seems like 2/3 of the size of my regular shawls I've knitted so far. So I guess I might stop short, else Mom would think I'm knitting a table cloth again.
Anyways, here's 2 shots of what's-been-going-on.

PS. Dear Karen, I got your package. will post about it very soon.
Knitted by
Unknown
at
11:48 PM
13
Loops
Loop @ Forest Path Stole, WIPs
Tuesday, June 19, 2007
Running on the forest path
To start this post, let me tell you about the "forests" in Singapore. The best preserve part would be the Bukit Timah Nature Reserve. Anyways, to think that such a tiny island has so much different species of birds and vegetation on it, is a little unbelievable. The Singapore Zoo is one of my favourite tourist spots, even though I stay a throw stone away from Chinese Garden. Yes I can view one of the pagodas from my kitchen windows.
Back to the knitting front, I cast on for Forest Path Stole last friday. The 20 rows of seed stitch were really tedious. When it was over, came the bottom 5 triangles, they were also in seed stitch but they were kind of fun to knit. Here's proof:
I took the whole of 1.5 days worth of knitting time to get used to the 3 charts. Fern and Lily of the Valley charts are the easiest to memorise but Birch Leaves is the hardest to get into my head. Even after 4 tiers, I still need to refer to that chart. My memory is really pathetic. I hope to finish 1 tier a day or 7 motifs in 2 days. That way, I can have it finish before August. From the way I see it, its not only a run but a marathon.
Knitted by
Unknown
at
8:49 AM
3
Loops
Loop @ Forest Path Stole, WIPs
Thursday, March 08, 2007
Tuesday, January 23, 2007
Looking for inspirations
Whenever I finished a project, I would just stare into space and loads of patterns ran through my mind. It takes the right mind set to start a particular project. And after binding off Shetland triangle, I started to run through my Yarn Inventory. My main objective was to destash so I guess its only appropriate to knit another garment which consumes loads of yardage.
I think planning a To-Knit List for this year is a very good idea. I don't think this is late though its already 3 weeks into 2007.
(in no particular order)
- Rambling Rose from Rowan 39, using Bendigo 4 ply cotton
- Serrano using Bendigo cotton
- Demi from Vintage Knits, using Rowanpsun Aran
- Lotus Blossom from IK summer 06 using SWTC Bamboo
The list is not exhaustive, these were just up my finger tips.
Here's a picture after finishing 1 ball of Patons Classic Merino. I most probably will leave out the hood again. This is the third hoodie which I purposely left the hoodie out.
Shetland Triangle is off the block but I have yet to have a chance to take a proper picture. However here's a teaser:
Wednesday, January 17, 2007
Shetland and Seasilk
Surprised? It's a midweek update which is something hard to come by on this blog. Anyway, I'm just excited about what's on my needles currently. I'm actually taking a short break from it.
I'm knitting Shetland Triangle from Lace Style with a beautiful hank of Handmaiden Seasilk, gifted by my lovely SP9 spoiler. The stitches glide so smoothly over Addi Turbos. The knitted material feels soft and spongy. I'm always delighted to knit with such lovely yarns. Currently, I've done 7 repeats as oppose to what the picture tells you, 1 repeat. I hope to get another 4 repeats + edging done by this weekend.
I'm so relieve that my package had reached its destination.
Sunday, December 10, 2006
Madly Madli's Shawl
Life has to move along so here I am, back with real knitting content.
Madli's was finished recently and I only had the time to take some pictures of it. As usual, I wasn't able to find a photographer so no modeling again. After blocking, the length came to be taller than me.


Pattern: Madli's Shawl by Nancy Bush
Yarn: less than 4 oz of Jaggerspun Zephyr in Ruby
Needle: 3.5mm Inox (grays)
Size: NA
Time to finish: slightly more than a week
This is the second time I worked with Zephyr, its still terrific to work with. The final product looked great. And I'm still working with Zephyr currently on the Peacock Feathers Shawl in Teal. I'm 1/3 away from finishing Chart 7. As its being knitted from a cone, it became a little unportable. Also, as the number of stitches increased, progress was getting extremely slow. Anyway, here's the blob of teal:
Meanwhile, its time for bed. Nitez~
Knitted by
Unknown
at
11:38 PM
10
Loops
Loop @ Finished Objects 2006, WIPs
Saturday, November 11, 2006
Sepia mode
It has been 24 months. Time just passes without people noticing. I can only have different FOs as the tiny milestones during this knitting journey. I thank all those who has made this a fulfilling journey. Speaking of which I had a litte SEX last weekend to commemorate this second knitversary.
Both yarns are in shades of blacks and greys. Pretty hard to capture these colors today so I shall leave them in sepia mode.
There's a knit out today. Ciao~
Saturday, November 04, 2006
Of Pink and Blue
I haven't been using pink yarns for a pretty long time. I can't even remember when was the last time. I was having a crush for pink a while ago, so here's a WIP in pink . Molly Ringwald from Knitscene Fall 06, second pattern I'd knit from (CPH was the first).
I did quite a real bit of modifications, which is unlikely of me. I tried to knit this in the round, however it seems way too huge. So huge that it can fit 2 of me in it. Thus I had to rip 1 ball worth of yarn. What you see now is the finished front piece. I'll cast on the back after updating the blog.
Next is Rusted Root, not really rusted in my case. In the picture, its almost done minus the 12 rows of ribbing. As I'm blogging now, its being dried for washing after wearing for the first time. I worn it to the office and got good comments on it. Totally cool from co-workers who don't knit.
I'll try to get a pic of me in it.
Back to my weekend knitting.
Tuesday, September 12, 2006
Sweaters post
There hasn't been any post on sweater projects for a long time. I have loads of yarns for at least 5 sweaters. (As if I need a lot of sweaters in this weather.) Well, here's 2 which are in 2 stage of work-in-progress.
All pieces are done, all Salina need is a seaming party. I find it too dark to seam at night, so I shall do it this coming weekend. I find that a fresh mind in the morning hasten the seaming process.
I started the Central Park Hoodie out of bordom and I need some simple cabling. I will most probably make it hoodless.
The pics are really crap, but this is the best I can get.
In swapping news, I have join the SP9 and Chocolate Swap. The latter sounds so yummy. I'm still waiting for my Lace swap package and my Yarn Aboard box is still traveling.
Sunday, August 06, 2006
Close, so close
I'm less than 20296 stitches (according to the excel sheet) away from finishing Chart 3 of FFL. No pictures to show, as its still a blue blob like last week's pic. The only difference is its mass and had occupied a larger area on my lap.
The weekend had been hot and dry. I was hoping for some rain to cool things down. The fan was on for as long as I was home. It seems like the dry season is here permanently.
I am so eager to finish FFL and have it block up. Before that, I need loads of junk food. Off to cook myself some instant ramen.
I just read the FFL KAL, and seems like the edging is going to be very boring. Hence, its gonna take more time than I expect. T_T
MORE RAMEN PLEASE!!!
Knitted by
Unknown
at
10:04 PM
3
Loops
Loop @ Frost Flowers and Leaves, WIPs

